Depuy Synthesis included the separation of a production facility from an existing pharmaceutical site and the subsequent provision of new utilities to serve this facility. It also included the internal demolition and strip out and subsequent fit out of this existing production building (in phases). This is for a change of manufacturing use from drug product tableting to medical device manufacturing. Sisk carried out the role of construction management contractor and PSCS, responsible for all site personnel and logistics.