navigation icon navigation icon hover

Alexandra Road Bridge, Dublin Port

CASE STUDY

Alexandra Road Bridge, Dublin Port

In November 2021, Sisk completed Alexandra Road Bridge at Dublin Port. The project involved the construction of a 150m long, 13m wide two-lane vehicular bridge with access ramps over Alexandra Road connecting the CDL yard and Terminal 4.