Works commenced in November 2010 and completed on target in April 2011. It was constructed adjacent to the existing Data Suite 1 which Sisk constructed in 2008. The Data Suite 2 design is identical to that of Data Suite 1 with provision in place to expand the area in the future to reach the same capacity as Data Suite 1.