This project involved complete strip out of the existing building including all M&E systems, lifts, partitions, ceilings, floor finishes, internal fixtures, fittings and finishes.

Removal of all Asbestos Containing Materials (ACMs). Demolition of the existing brick facades & windows. Demolition of roof level reinforced concrete plantroom. Demolition of the existing Block A reinforced concrete structure to the north & south elevations & replacement with a new steel frame. Structural alterations to the existing escape staircases including removal of the existing concrete stairs & replacement with a new steel stairs. Demolition and infill of the existing main staircase. This project was complete in 2015 with a value of €17.9 million.