Cappagh Hospital

Cappagh Hospital

Cappagh Hospital

Client : Cappagh Hospital Board of Management

Value : £2.3m (€2.6m)

 

This project involved the Design & Build of 3 Orthopaedic Operating Theatres for the Cappagh National Orthopaedic Hospital.
The project is unique in that the 3 theatres are of modular construction and were constructed off-site. This was an extremely fast tracked project with the overall duration of the project including testing and commissioning of the Theatres taking just over 16 weeks.
The building consists of 13 individual units which were practically finished prior to arrival on-site. Once delivered to site the units were installed and weathered allowing for final testing and commissioning of the Theatres.
The on-site enabling works were carried out simultaneously to the manufacture of the modular units off-site therefore significantly reducing the overall program. The building is also designed to allow for future relocation of full facility if required.  

 
The Theatres include a UCV ventilation system incorporating a Laminar flow canopy and will be equipped with state of the art Operating Theatre Equipment including fully integrated AV Systems.